Electric Heating Shawl Blanket Winter Heating Cloak Lunch Break Quilt Leg Warmer Apron Outdoor Electric Heating Pad Small Blanket
Packaging information: |
|
---|
tips:
1. Electric heating shawl is not divided into different sizes, suitable for both men and women!
2. It is recommended to use the heating produced by our factory shawl dedicated 5V/2A power bank!
Instructions for use:
1. Power button operation: Plug in the power supply(Or power Bank), long press to turn on, long press to turn off.
2. After the power button is turned on, the red light(High temperature) breathing Light mode, about 5-15 minutes automatically turn into white light.
3. Button mode: click button to set red light(High temperature), Green Light(Medium temperature), blue lamp(Low temperature), loop mode.
4. High temperature 55 ℃ ± 5 ℃, medium temperature 50 ℃ ± 5 ℃, low temperature 45 ℃ ± 5 ℃(The data of the third gear temperature is for reference only. This parameter is the result of laboratory surface test on heater band, and the surface temperature of clothes will be lower than this parameter)
https://offer.1688.com/offer/post/fill_product_info.vm? spm=a26286.8292843.0.0&operator=import&offerId=579220467295&requestId=C. I .31D3737A68B64B96AB299AAD662ADC20&pageSrc=fusion&frontVersion=2017
welcome to our store. All our colleagues sincerely serve you and undertake all kinds of business gift orders, distributors/wholesalers are welcome to inquire, meet the needs of different customers. Mainly for offline retail, small wholesale, clothing stores, gift companies and other customers.
Other items:
1. Product MOQ: new color, new fabric, new style, the minimum order quantity is 2,000 pieces/time. If the customer demand quantity is lower than the MoQ, the unit price will be slightly increased, communicate with customer service.
2. Production Time: generally, the production time of cloth in stock is about 20 days. If the goods are very urgent, the production can be arranged preferentially according to the arrangement of orders in the workshop and the delivery should be made in advance as far as possible. Special materials and colors order material takes about 20-25 days.
3. Packing method: a single product is packed in OPP bag (transparent plastic bag), and then it is packed in a carton safely.
The freight set in this store is for reference only. If you have any questions, contact customer service to modify the freight after ordering. By default, small items are sent to YTO/Best Express, if you need other express or logistics, please contact our store customer service instructions.